Moss Point Marine (MPM) Operations
   

The MPM Operations facility is in a protected location along the east bank of the Pascagoula River just north of Interstate 10. Convenient water, highway, and air transportation access is provided. The facility has three launch ways and the maximum vessel length that can be built under cover is 91 meters. The facility has steel and aluminum fabrication shops, a carpenter shop, woodworking, electrical, electronics, pipe shop, mold loft, and ample warehouse storage space available.
 
The MPM Operations facility offers 1,150 linear feet of steel sheet pile bulkhead waterfront. Depth along the launch ways is over 25 feet. The entire waterfront is served by three (3) crawler cranes of between 100 and 225 ton capacity, two (2) 18 ton mobile utility cranes, and complete underground services.